Instructions to Designers

The documents listed below are provided in Word format for the convenience of those contracted to provide design services to Facility Planning and Control, State of Louisiana. No other use is intended or authorized.

Do Not Modify these Documents

Those providing design services to Facility Planning and Control are to use these documents exactly as they are found on this website. Except as specifically provided for therein, no modifications of any kind are to be made to these documents. Any errors or inconsistencies detected in these documents should be brought to the attention of Facility Planning and Control. No attempt to correct them shall be made by anyone else.

Instructions to Designers Word Files

Louisiana Code for State Owned Buildings (Word document) 

The Louisiana Public Work Bid Form is published in the Louisiana Administrative Code under Title 34, Government Contracts, Procurement and Property Control, Part III. Facility Planning and Control, Chapter 3. Louisiana Uniform Public Work Bid Form. http://www.doa.louisiana.gov/osr/lac/books.htm

CONTRACT
between
Facility Planning and Control
and
Designer


 

2006 Edition, Louisiana Capital Improvement Projects Procedure Manual for Design and Construction

2004 Edition, Louisiana Capital Improvement Projects Procedure Manual for Design and Construction

Changes for 2004 Edition

BCI and CPI and Schedule of Representative Fees

PDF image1985 Edition, Louisiana Capital Improvement Projects Procedure Manual for Design and Construction

 

Note:Requires an Adobe Acrobat Reader Version 4.0
Acrobat Reader Image